This project involved the demolition of 8 existing buildings on the former Gunns sawmill site in Smithton.
Key considerations relating to the risks associated with the demolition of the buildings:
Innovative thinking and planning for the project include the re-use of clean fill/rubble from the site to construct hard-stands for felled timber storage on a neighbouring property, along with fill for existing pits on-site. Scope of works included demolition of all buildings, services, structures and equipment that exist on the site to the top of the ground floor slab surface level or exterior surface.
| Client | Saputo Dairy |
| Duration | 6 months |