The project required the demolition of the 4 storey Anne O’Byrne Building and two ancillary buildings on a site adjacent to the Launceston General Hospital.
Key aspects:
Hazell Bros salvaged several large steel beams from the roof structure for reuse
200T of steel was sent for recycling
The project required temporary works assessments and staging to be carefully considered.
The project utilised a 49T excavator with a long-reach boom and a custom-fitted concrete crushing attachment to undertake the uppermost demolition works