This project involved the demolition of 8 existing buildings on the former Gunns sawmill site in Smithton.
Key considerations relating to the risks associated with the demolition of the buildings:
Innovative thinking and planning for the project include the re-use of clean fill/rubble from the site to construct hard-stands for felled timber storage on a neighbouring property, along with fill for existing pits on-site. Scope of works included demolition of all buildings, services, structures and equipment that exist on the site to the top of the ground floor slab surface level or exterior surface.
Client | Saputo Dairy |
Duration | 6 months |