The demolition works at the Royal Hobart Hospital in Hobart’s CBD was part of the larger construction works undertaken by the John Holland / Fairbrother joint venture to replace the hospital’s B Block with a new K Block, while the hospital remained fully operational. Hazell Bros was awarded the subcontract tender for the demolition of B Block located in the northwest corner of the hospital complex. The project was successfully completed through in-depth staging that allowed machinery to reach the higher levels of the building’s “tower” by constructing a ramp comprised of debris from the lower levels.
Scope of works included:
Demolition of the existing Block B involved substantial technical, physical and logistical challenges that had to be overcome for successful project delivery.
The demolition work was completed within a live hospital environment which required:
Hazell Bros was a Category 2 Winner at the Tasmanian 2017 CCF Earth Awards for the Royal Hobart Hospital Redevelopment – Block B Demolition.
Client | John Holland Fairbrother Joint Venture |
Duration | 2016/2017 |